Here are a few photos from the site as we wrap up construction. The pool was just filled and landscaping is next. Next week we will have a HERS rater come to do airflow testing on the bath fans and range hood. This will earn us two LEED points in EA 4.3 and 5.3 for verifying compliance with ASHRAE 62.2.
|
Stucco and sustainable Resysta for exterior cladding |
|
LED hanging light over the kitchen island |